Slab Cutting fire concrete block walls covered floor
Pay in 4 interest-free payments of $25.00 Learn more
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Aug 26 - Aug 31
Live Spec
Slab Cutting fire concrete block walls covered floorA steel slab taken mid cut, molten sparks cascading in every direction, the scale of the operation filling the frame. This is the basic oxygen and continuous casting era of Port Kembla Steelworks, where slabs produced from 200 250 tonne BOS vessels move through the plant as flat steel destined for domestic and export markets. Australia's largest crude steel production plant, photographed in 2016. Part of the BlueScope Port Kembla series.
Store: nyherosfund.org · Domain: nyherosfund.org

























